MOTOROLA SOLUTIONS COMPANY

The Motorola Solutions Company office headquarters (formerly WatchGuard) has the capacity to accommodate approximately 500 employees. The entire office building is finished out and includes a state-of-the-art engineering laboratory with a large anechoic chamber room, a full environmental test chamber for accelerated life testing, 24 electrical test benches and a fully equipped prototype shop. The building also includes a large training facility, vehicle installation garage with an officer’s lounge, customer demonstration room, a separate engineering wing, and other employee amenities include a large recreation room, and an in-house medical clinic for employees.

140,000 SF / 3-Story / Tilt-Wall

Client: WatchGuard Video
Architect: GFF

“AP was a great partner from the beginning stages of preconstruction and throughout construction, and performed exceptionally to ensure that the final product was of the highest quality and matched the owner’s vision and architect’s design intent. I offer my full recommendation for AP as a solid contractor who has proven their ability to perform consistently and deliver excellent results.”

— Robert Vanman, WatchGuard Video