Raytheon AIM Center Phase I

 

AP completed the Design-Build MEP Raytheon AIM Center Phase I project that includes a 184,000-sf, ground-up manufacturing building with 4,160V electrical distribution to 3 mini-substations.  9 - CHW AHUs, 1,200T air cooled chiller plant, solvent exhaust system, distributed hydraulic system, liquid and dry nitrogen distribution, 30,000-sf ISO 7 cleanroom with specialized wall and ceiling system nearing 1,200 fan filter units, compressed cry air distribution, process chilled water heat exchangers and distribution, and deionized water skid and distribution.